Best Gum

Modernization of hydraulic presses for the regeneration of brown coal conveyor belts at BESTGUM POLSKA SP. Z o.o. Works in 2011-2012 included modernization of the control system for two presses based on a PLC controller, operator panel and a system of sensors and control valves. Complete visualization and archiving of the process.

BUSKOWIANKA

Modernization of the bottling line for PET bottles for BUSKOWIANKA S.A. Work in 2012 included the adaptation of all machines for the production of water in bottles with low thread.

KONSTAK SP. ZO.O.

Design and implementation of liquid storage tanks monitoring for KONSTAK SP. ZOO. (ultimately PLATINUM OIL). Work in 2011 included the design and implementation of a supervision system for the operation of liquid storage tanks based on a PLC with an operator screen and a leak detection system.

Modernization of the control and I&C system for the flue gas desulphurization installation for units 5 and 6 of Bełchatów SA Power Plant. Supervision over the modernization of the DeltaV control system and the AKPiA for Emerson Process Management Power and Water Solutions. The scope of work included: coordination of design, supervision of assembly and commissioning works.